Today: May 21, 2018, 10:36 pm
  
Industries

Truedek TD110 Panels Used at Westmead Hospital Extension

PR-Inside.com: 2017-06-29 09:41:16
Premier Steel Technologies, the creator of custom-built manufacturing equipment and the manufacturer of Truedek steel decking system, have recently completed an extension to the floor of Westmead Gastroenterology ward .

Working with AGS Structural P/L at Westmead Hospital Sydney, NSW, Trudek provided a cost effective and non-disruptive solution to extending the floor of the hospital ward. With the help of Truedek TD110 panels manufactured exactly to required measurements AGS Structural was able to meet their challenge of an infill slab.


The exact measurement of the required formwork was a minimum of 5 metres between existing concrete beams and spanning close to 5.4 metres. The work had to be carried out without disrupting the business located underneath where the infill slab was going to be. The shops are required by the hospital and operate seven days a week. Truedek TD110 panels, measuring 5.4 metres, were manufactured to exact measurements in the factory and then delivered to the site.

The light weight of the Truedek panels made it possible for AGS Structural to carry each panel up stairwells in the hospital and put them into place without any additional equipment. They were able to do it in the evening minimising disruption to the daily operation of the hospital and the businesses nearby. The panels were laid on support angles installed prior to the Truedek panel installation.

Truedek’s steel decking system offers flexibility in both design and construction. Construction differs according to the configuration and depending on span, load and fire rating requirements.

Premier Steel Technologies Pty Ltd has a reputation as a purpose-built manufacturer of equipment, able to bring myriad efficiency, quality and safety benefits to countless industries through the supply of precise and well-tailored machinery solutions. Established in 1980, the company has a name consistent with high performance and the best in quality.

Truedek helps save time and money since they do not require propping or back propping, with the exception of unsupported edges reducing labour required for installation. This reduces cycle time drastically. It also reduces cutting requirements, material scrap and wastage, as Truedek is manufactured according to the required site lengths.

For any queries regarding Truedek, contact Ross Grey, National Manager, Truedek at +61 02 9756 0602 or email rossgrey@truedek.com.au.

For more information on Truedek: www.truedek.com.au/

Press Information
Premier Steel Technologies
229 Newton Road,

Wetherill Park, NSW 2164

Australia



02 9756 0602
email
www.truedek.com.au/

Published by
Cam Wilkes
006499503888
e-mail
www.pureseo.co.nz



# 377 Words
Related Articles
 
More From Industries
Tarps Now® Announces New Online Configurator for [..]
ST. JOSEPH, MICHIGAN, UNITED STATES, May 8, 2018 / -- Tarps Now® is pleased to announce the development and release [..]
Singapore lanyard company offers clients one-stop shopping
SINGAPORE – Lanyards are a popular tool in today’s culture, used by everyone from businesses, to schools, to sporting events [..]
Trillium Technology to Protect U.S Armed Forces [..]
Washington, D.C., May 4, 2018 - (ACN Newswire) - Trillium Secure, Inc., the global leader in transportation cybersecurity, announced [..]
Tokyo International Fire and Safety Exhibition 2018
- The largest firefighting and disaster prevention exhibition in Japan - All the latest products and services for fire and [..]
Tarps Now® Releases New Lines of Sports [..]
ST. JOSEPH, MICHIGAN, UNITED STATES, April 26, 2018 / -- Tarps Now® has released a new line of indoor and [..]

Disclaimer: If you have any questions regarding information in this press release please contact the company added in the press release. Please do not contact pr-inside. We will not be able to assist you. PR-inside disclaims the content included in this release.